Infrastructure
Project Overview
High-voltage offshore transformer platform serving the 450 MW Northwind wind farm, installed 80 km offshore in 28-metre water depths.
The Challenge
Hostile North Sea conditions, strict offshore installation weather windows, and zero-defect requirements for high-voltage electrical equipment.
Our Approach
Jacket structure fabricated at our Norwegian yard, topside modules assembled onshore and installed in a single 14-day weather window.
Client
European Energy Consortium
Sector
Energy
Key Result
450 MW Capacity